City of Yuma 2023 Integrated Water Resources Master Plan: Jackrabbit Mesa pumping and capacity
About this source
Final September 2023 Carollo city master plan, downloaded directly from city reports index. Table 5.3 on page 5-6: JRM on 24th Street between Otondo Drive and Avenue 9E; existing capacity 315 gpm. Section 5.2.3.3 page 5-7: interim diversion station built in 2007 to allow JRM treatment within capacity, since decommissioned; all flows conveyed through 18-inch gravity main on Avenue 9E south of Stetson Street to Desert Dunes. Repumps Terrace at the View; Coyote Ranch and Agua Viva connect to common force main. Section 5.7.3 page 5-23 documents competing pump pressure limitations. Section 5.8.2.1 page 5-26 recommends 1,160 gpm; these planning targets do not verify awarded equipment. Historical 2007 treatment account conflicts with old CIP 2005 offline date. No overflow incident inferred. September day is not specified in the report; publicationDate omitted from source.
- Source type
- Government record
- Source classification
- Primary source
- Source date
- Not established in the reviewed record
Publisher / issuing organization 1
Related articles 1
- NewsYuma Approves $1.31 Million to Replace Jackrabbit Mesa Sewer Lift Station
Yuma approved a $1.31 million Jackrabbit Mesa sewer lift station replacement to address pumping and capacity needs, with construction anticipated November to March.