California CEQAnet Picacho Road Bridge Replacement filing (SCH 2025030216)
About this source
California CEQAnet filing for the Picacho Road Bridge Replacement project. Its historical project description says the timber bridge had cracked and was past its useful life. This earlier filing does not establish the later project cost, funding or schedule.
- Source type
- Government record
- Source classification
- Primary source
- Source date
- Not established in the reviewed record
Relevant excerpt / notes
The Oct. 20, 2026 Public Works report is the source for the current preliminary repairability assessment.
Original URL
https://ceqanet.lci.ca.gov/2025030216Related articles 1
- ExplainerWhy has the Picacho bridge been closed for 19 months? Imperial County's paperwork tells the story.
A guardrail crash, a federal canal, a shortage of floating platforms, a concrete curb in the water and, finally, an engineer’s finding that the bridge probably can’t be saved. Here’s how a closure “until further notice” turned into a year and a half.
Related topics 1
- Winterhaven's Bridges: Picacho, Arnold Road and the Quechan Nation
The Picacho Road Bridge into the Fort Yuma Quechan Reservation has been closed since March 2025, and the only detour crosses a bridge Imperial County has declared an emergency. We're following the records, the Tribe's requests and what the county does next.